Installation Checklist
In order to ensure superior homeowner satisfaction, we must work together. We feel our partners deserve on time and complete installation. A contract representative will confirm your window/patio door delivery dates. Scheduling of installation will be in accordance with scheduled delivery dates and lead times based on receipt of the installation checklist.
It is required to use the checklist to notify Clearview that the following is complete and ready for installation.
- Rough Openings are plumb, level & framed to Clearviews rough opening sheet.
- Roofs are on and loaded.
- Drywall stocked.
- Doorplates are cut out at Call-Out widths.
- Concrete at doorsill is level. No bolts protruding.
- Concrete is dry.
- All openings have shear panel for strips where needed.
- Sheet metal is down on deck doors.
- Floor is marked, if an option or change has been made at the opening.
- All recessed and pot shelf windows have been lined with bituthane.
Please be sure to contact either Danielle x.12 or April x.44 with any requested modification of installation dates.
Installation dates can be reserved once the installation checklist has been signed and faxed to Clearview (661) 257-1819. If installation checklist is received within 24hrs of confirmation of delivery dates, there will be no delay of installation.
If openings are not ready for installation, installers may be required to be rescheduled; there could be a $200 trip charge to cover expenses.